Drainage · Grading · Stabilization
Project Highlight-
Drainage

Before getting into pipe sizes, consider what came off this property. Ray Lawns removed 11 tall trees, including their roots, and trucked away 180 cubic yards of red soil. This was substantial site work, not a small trench cut into an otherwise untouched lawn.
The completed drainage work was just as specific. Ray Lawns installed approximately 174 linear feet of French drain and completed finished grading that followed the engineered drainage patterns. The crew also permanently stabilized about 10,500 square feet of disturbed ground.
This project highlight takes a closer look at that work, including the details below the surface and the protection installed across the surrounding ground.

The completed work went beyond the drain trench
Ray Lawns carried out the engineered grading and erosion control plan alongside the French drain installation. The completed work addressed finished elevations and protection for exposed soil, with each part serving its own purpose.
Moving soil wasn't the same as fine-grading it, and installing the drain was only one part of completing the site. The project connected those stages under one drainage plan rather than treating them as a series of unrelated yard improvements.

01
Protecting the ground

Protecting the ground during construction
Opening up a site changes more than its appearance. Excavation exposes soil to rainfall and runoff, so Ray Lawns installed temporary erosion and sediment controls alongside the earthwork. Protecting exposed soil and containing sediment are important parts of construction-site management.
For this property, Ray Lawns installed silt fence, inlet and outlet protection, erosion control blanket, and the other temporary devices identified in the engineered plans. Their locations and installation followed the site-specific plan rather than a standard layout applied to every property.
The distinction between temporary protection and permanent stabilization matters here. Construction-stage controls protected the work area while it was disturbed. The final seed and surface-covering work addressed the ground remaining after grading.
02
Clearing & soil removal
Removing 11 trees and 180 cubic yards of soil
Ray Lawns removed 11 tall trees, roots and all. The work extended below the tree trunks instead of stopping at the cut. That below-ground removal is an important part of understanding the extent of the clearing.
The crew also removed 180 cubic yards of red soil and trucked it away from the property. The crew exported this material from the site, rather than spreading it elsewhere on the property or leaving it in a stockpile.
Those quantities show why this project involved more than the drainage trench itself. Large-scale clearing and soil handling were part of the job, while the drain followed its own defined route and material requirements.
Fine grading was another stage. Bulk earthwork changes the amount of material on site; fine grading brings the surface to the intended elevations. Ray Lawns completed both stages rather than treating the cleared work area as the finished result.

03
Inside the French drain

Inside the completed French drain
Ray Lawns installed about 174 linear feet of French drain in a 20-inch-wide trench. The completed assembly combined ADS N-12 8-inch perforated pipe with a sock, nonwoven geotextile fabric, and washed #57 drainage stone.

| Component | Completed installation |
|---|---|
| Drain length | Approximately 174 linear feet |
| Trench width | 20 inches |
| Pipe | ADS N-12, 8-inch perforated pipe with sock |
| Fabric | Nonwoven geotextile wrap for the drainage assembly |
| Drainage aggregate | Washed #57 stone surrounding the pipe |
A collection pipe below the surface
The perforated pipe was installed to collect water reaching the drainage assembly. Unlike a solid pipe that carries water from a connected source, its openings allow water to enter along the collection route. The 8-inch pipe and approximately 174-foot length were part of this completed installation, not a standard recommendation for every yard.
Two distinct fabric details
The completed system included a sock on the perforated pipe and a nonwoven geotextile wrap. Both details matter when describing the installation; the assembly was more precise than simply “pipe and gravel.”
Nonwoven geotextiles provide filtration and separation in subsurface drainage. Here, the fabric was installed around the drainage materials to help separate them from the surrounding soil while allowing water through.

Washed stone around the pipe
Washed #57 stone was installed around the pipe. In a conventional French drain, the spaces between clean drainage aggregate provide a route for water toward the perforated collection pipe. The stone is part of the working assembly, not a decorative finish.
These details explain what the completed drainage installation contained. The overall length shows the extent, while the pipe, fabric, and stone describe the system installed along that route.
04
Shaping the surface
Shaping the surface to the drainage plan
After installing the drainage system, Ray Lawns fine-graded the site to the elevations and drainage patterns shown on the engineered plans. The finished grading was completed to support positive surface drainage and direct water along the engineered route.
That does not mean making the entire property flat. Fine grading is about the relationship between elevations across the work area. The finished surface was graded to support the drainage layout designed for this site.
It was also a different task from trucking away the red soil. Removing 180 cubic yards addressed the larger earthwork operation. Fine grading brought the remaining surface into line with the engineered finish.
This is where the surface work and the underground scope come together. The final shaping was not simply a cosmetic step after the drain. It was part of how Ray Lawns carried out the engineered drainage plan.

05
Stabilizing the site
Covering approximately 10,500 square feet
Ray Lawns permanently stabilized approximately 10,500 square feet of disturbed ground. The work included topsoil as needed, followed by seed, fertilizer, and straw. The crew also installed erosion control blanket in the areas identified on the engineered plans.
The installed blanket was Hanes Geo Straw Mat Single Net, secured with Pro-Trade 4-inch Flat Top 11 Gauge sod staples in the designated areas. Those fasteners were part of the blanket installation, not an indication that sod was included in the scope.
Seeding starts a growing-in period rather than producing a mature lawn immediately. Straw and erosion control blanket help protect exposed ground while vegetation establishes. That makes the surface covering an important part of the stabilization work, especially after extensive earthmoving.
The stabilization area extended beyond the drain trench. The completed work addressed the disturbed ground around the construction area, leaving the finished site with both soil protection and drainage measures in place.

What this project brings into focus
The 174-foot French drain is one part of this project, but it does not tell the whole story. Ray Lawns also removed 11 trees with their roots and hauled 180 cubic yards of red soil off-site. The completed work linked that substantial preparation to a defined drainage assembly and a carefully graded finish.
The stabilization work completed the project by addressing the ground left exposed by construction. This project is a useful look at the work around a drainage installation, not just the pipe hidden beneath it.

Questions about this project
Why include grading as well as a French drain?
The scope addressed water below ground and at the surface. The French drain provided the specified collection assembly, while fine grading was intended to establish the planned surface drainage patterns. One did not replace the other.
Was the excavated red soil reused on the property?
The 180 cubic yards described for this project were trucked away from the property. They were not retained as an on-site soil pile.
Did the stabilization scope include sod?
No. The completed stabilization work included topsoil as needed, seed, fertilizer, and straw, with erosion control blanket secured in the designated areas. The sod staples were blanket fasteners.
Are these drain dimensions appropriate for every yard?
No. The approximately 174-foot length, 20-inch trench width, and 8-inch pipe belong to this project. Another property would need a drainage approach suited to its conditions and any applicable engineered plan.

Talk with Ray Lawns about your drainage project.
Drainage work starts with understanding the property. Contact Ray Lawns to discuss your concerns and request a free estimate. Already have engineered grading or erosion control plans? Mention them when you get in touch.
(423) 618-4477